• <dd id="gbdy1"></dd>

    1. <em id="gbdy1"><acronym id="gbdy1"><input id="gbdy1"></input></acronym></em>
        1. <button id="gbdy1"><object id="gbdy1"></object></button>
          <rp id="gbdy1"></rp>

          中文English

          Cooperative OA office system

          ABOUT US

          ABOUT US

          Founded in 1975, Guangzhou Water Conservancy & Hydropower Station Construction Engineering Co., Ltd. has become a national high-tech enterprise with the following qualifications, namely, a Grade-1 general contractor of construction of hydraulic and hydroelectric engineering, a Grade-1 general contractor of construction ofmunicipal public engineering, a Grade-2 general contractor of building construction engineering, a Grade-3 general contractor of construction of electric power engineering, a Grade-3 specialist contractor of power transmission and distribution projects, a Grade-3 specialist contractor of environmental protection engineering and a Grade-3 specialist contractor of river & lake renovating projects, etc.. As a building enterp...

          ENGINEERING

          ENGINEERING

          • BT project of extension project of Guan ...
            The general investment estimate for the extension project of the Guan Shan grand pump station is 82 million 560 thousand yuan, and the construction of the BT model is adopted. The scale for the 2 diameter 2.9 meters vertical type axial-flow pump. It
            2016-03-31
            View Details
          • Zhanjiang City Mulberry River Road five ...
            Zhanjiang City Mulberry River Road five road reconstruction project, including Mulberry River Road South, Kang Ning Lu, Kang Shun, Yuejin Road Zhongshan Road, five road. It is divided into five single projects, independent acceptance, separate repurc
            2016-04-10
            View Details
          • Lixi Barrage Consolidation and Reconstru...
            Lixi Barrage is one ofcascade development projects for Liuxi River. Located at the junction between Lixi Village, Huadong Town, Huadu District on the lower reach of this River and Zhuliao Town of Baiyun District, it is multi-purpose hydro-engineering
            2016-03-31
            View Details
          • Guangzhou City Creek silt centralized di...
            Tertiary sludge solidification technology is based on the physical properties and chemical composition of the sludge, using a suitable curing agent and process the effluent sludge harmless treatment, and the curing method for different materials, it
            2016-04-11
            View Details
          • 01

            BT project of extension project of Guan ...

          • 02

            Zhanjiang City Mulberry River Road five ...

          • 03

            Lixi Barrage Consolidation and Reconstru...

          • 04

            Guangzhou City Creek silt centralized di...

          NEWS

          NEWS

          Chongyang Festival Activity in 2017...

          In October, the Double Ninth Festival, march. At 9:00 on the morning of October 27, 2017, the trade union and the group of Hydropower Construction Engineering Co. Ltd. Guangzhou branch organized the "passionate Yongpangaofeng" of Baiyun Mountain clim

          View Detail

          View More

          CULTURE

          CULTURE

          A片毛在线视频免费观看,国产亚洲欧美日韩一区,欧美日韩精品一区二区在线,夫妇野外交换全过程A片,强奷乱码中文字幕